Insulation resistance of installed equipment
Insulation Testers
The preventive measurement: the one that finds a failure while it is still a trend.
Insulation resistance of installed equipment
- Category
- Field Measuring Devices
- Form
- Handheld / portable
- Industries
- Energy
What this group is for.
Written as engineering fact. Nothing on this page states a specification the manufacturer has not supplied.
Multiple test voltages so motors, cables, switchgear and low-voltage wiring are each tested at the voltage that is meaningful for them.
Trend-capable results, because insulation is judged by how it changed since last time, not only by today's number.
Automatic discharge after the test, which is a safety feature and not a convenience.
Continuity testing in the same instrument, so a bonding check does not need a second tool.
Highlighted models
Models engineers most often start from. The right one depends on the range you need to resolve and the conditions on site.
Insulation Tester
IR4059
5 ranges from 50 to 1000 V
Ask about the IR4059
High Voltage Insulation Tester
IR5050
Up to 5000 V
Ask about the IR5050
Insulation Tester
IR4053
Built-in PV function
Ask about the IR4053
Where it is used.
The situations this group is bought for, and the points on a real installation where it is connected.
- Periodic preventive maintenance on motors, cables and switchgear.
- Commissioning and handover testing of installations.
- Fault location on a circuit that trips its earth leakage protection.
- Condition assessment before a shutdown is scheduled.
Typical measurement locations
Insulation resistance of windings
Transformer
Insulation does not fail suddenly. It trends, and the trend is only visible if someone measured it last year too.
Earth resistance, phase sequence, live-line check
PV array / generation
The three checks that happen before anyone is allowed to start work.
Insulation Testers: which one fits your measurement?
Give us the quantity, the range you need to resolve and the conditions on site. We will name the models that cover it and say plainly where they stop.
What Hioki commits to, for Insulation Testers.
The four criteria of innovation, read for this instrument group.
Increasing customer value
Production system
Insulation testing is routine maintenance on a fixed schedule. Instruments are supplied to keep that schedule intact.
Delivering peace of mind to customers
After-sales service
Insulation records are compared year on year to catch deterioration. Calibration keeps this year's number comparable with last year's.
Pursuing productivity and precision
Manufacturing capabilities
A stable test voltage and a steady reading are designed in and verified during manufacture.
Creating new customer value
Collaborative development of new products
PV strings and battery systems needed insulation methods of their own. They were developed with the technicians who test them.