Insulation resistance of installed equipment

Insulation Testers

The preventive measurement: the one that finds a failure while it is still a trend.

Hioki IR4057-50 Insulation Testers
Pictured: IR4057-50

Insulation resistance of installed equipment

Category
Field Measuring Devices
Form
Handheld / portable
Industries
Energy

What this group is for.

Written as engineering fact. Nothing on this page states a specification the manufacturer has not supplied.

  • Multiple test voltages so motors, cables, switchgear and low-voltage wiring are each tested at the voltage that is meaningful for them.

  • Trend-capable results, because insulation is judged by how it changed since last time, not only by today's number.

  • Automatic discharge after the test, which is a safety feature and not a convenience.

  • Continuity testing in the same instrument, so a bonding check does not need a second tool.

Highlighted models

Models engineers most often start from. The right one depends on the range you need to resolve and the conditions on site.

Request the spec sheet
Hioki Insulation Tester IR4059 Insulation Tester IR4059 5 ranges from 50 to 1000 V Ask about the IR4059
Hioki High Voltage Insulation Tester IR5050 High Voltage Insulation Tester IR5050 Up to 5000 V Ask about the IR5050
Hioki Insulation Tester IR4053 Insulation Tester IR4053 Built-in PV function Ask about the IR4053

Where it is used.

The situations this group is bought for, and the points on a real installation where it is connected.

  • Periodic preventive maintenance on motors, cables and switchgear.
  • Commissioning and handover testing of installations.
  • Fault location on a circuit that trips its earth leakage protection.
  • Condition assessment before a shutdown is scheduled.

Typical measurement locations

Insulation resistance of windings

Transformer

Insulation does not fail suddenly. It trends, and the trend is only visible if someone measured it last year too.

Ask about this point

Earth resistance, phase sequence, live-line check

PV array / generation

The three checks that happen before anyone is allowed to start work.

Ask about this point

Insulation Testers: which one fits your measurement?

Give us the quantity, the range you need to resolve and the conditions on site. We will name the models that cover it and say plainly where they stop.

Open the full enquiry form

An engineer replies with ranges and methods, not a brochure.

What Hioki commits to, for Insulation Testers.

The four criteria of innovation, read for this instrument group.

Hioki IR4057-50 Insulation Testers

Increasing customer value

Production system

Insulation testing is routine maintenance on a fixed schedule. Instruments are supplied to keep that schedule intact.

Delivering peace of mind to customers

After-sales service

Insulation records are compared year on year to catch deterioration. Calibration keeps this year's number comparable with last year's.

Pursuing productivity and precision

Manufacturing capabilities

A stable test voltage and a steady reading are designed in and verified during manufacture.

Creating new customer value

Collaborative development of new products

PV strings and battery systems needed insulation methods of their own. They were developed with the technicians who test them.